Devry Acct 251 Project and Progress Report

DEVRY ACCT 251 Project and Progress Report

Check this A+ tutorial guideline at
http://www.acct251assignment.com/acct251/acct-251-project-and-progress-report
For more classes visit
http://www.acct251assignment.com

Course Project: Peachtree Project
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this
page.
(See the Syllabus section “Due Dates for Assignments & Exams” for due dates.)
Your Assignment| Grading Rubrics
Your Assignment
Students will be required to complete a project in this class that tests their
knowledge & skills in managing the books for a small business using Peachtree
Complete Accounting 2010. The assignments that you will be completing during
Week 1 – 4 focus on specific Peachtree skills; however, this assignment allows you to
use what you have learned about Peachtree to manage the books for a firm without
\’step-by-step\’ guidance, which is typical for assignments you will see in the
workplace.
You will complete Project 1 (Susan Watson Accounting), which is located at the end
of Chapter 11. As part of this project, you will generate the required reports as listed
in the textbook as well as the Check Your Progress worksheet (which you will create
in Excel) at the end of the project.
• If you fail to submit the “Check Your Progress” worksheet, you will lose 20%. Once

you have submitted your project and it has been graded, you cannot resubmit it.
• You will need to generate the reports when requested per the project for you
cannot assume that every report is generated at the end of the project.
You do not need to submit the reports as listed as “Optional”. All of the instructions
for completing the project are listed in the textbook.
When you are done, you will submit one Excel workbook titled
“ACCT251PeachProject” that contains an Excel worksheet for each of the reports
required, as well as one worksheet that contains the Check Your Progress worksheet.
• Failure to submit one...