Do you have a knowledge of operation of heavy hammer crusher? Here I will share with you.1. in order to ensure the maximum yield of hammer crusher, charging must continuously even distribution of the rolls.2. should be regularly check whether the material mouth had blocked phenomenon, and in the motor stopped working to stop before feeding, when material completely dropped, the roll of a power outage, motivation may idling.3. if roll along the length direction feeding not even, roller surface not only faster, and each point wear is uneven and will appear ring groove, the normal work have been destroyed and broken the uneven size products. Therefore, in addition to crushing the roll crusher, outside of finely roll crusher, usually a feeder, to ensure that the feeding successive and even, and the length of the feeder with roller length equal, make the feeding length direction along the roller uniform.4. the reasonable maintenance and correct crusher of operation, can ensure long-term continuous work, reduce stop time, only normal management and every day to check the normal work of the roll crusher, to prevent failure, and ensure that the work continuously. Therefore, the operator should pay attention to the following items:(1) pay attention to all parts, such as the discovery of bolts shall be immediately screw loose; (2) before work must first start roll crusher, wait for after normal speed, again to machines feeding, when parking program instead; (3) check the material regularly, such as the discovery of a mouth clogged, should be cleared; (4) check the vulnerable parts wear degree, always be worn parts; replace (5) not make machines produced load, should always be electric instrument; (6) bear oiling in time, do not make in the place of oil bearing; (7) be controlled bearing temperature, may not be higher than the air temperature around 25 to 30; (8) put the plane, chassis activities device should remove dust and material, so as not to roll crusher met...