Pengukuran Kuantiti Bangunan
CONTOH 4: SUBSTRUKTUR DENGAN ASAS PAD
1250
x 1250 x 300 pad footing
150
x 500 ground beam
300 x 300 column stump
iukur
ahaja.
liberi kerja
GROUND FLOORPLAN
(not to scale)
Notes: l. Excavate top soil l00mm deep to be deposited 10.00m from site.
2.
J.
40mm thick.
concrete cover for pad footing, corumn stump and ground beam is
Lean concrete shall be ofGrade 7 concrete.
4.
20 concrete.
concrete to footings, stumps, ground beams and bed shail be of Grade
DRAWING NO. AA/PF/I
81
Kerja-kerja Di Bawah Aras Lantai Terbawah
300 x 300 column
original ground level
C
damp proof membrane
L
SECTION OF PAD FOOTING (not to scale)
oohm
sY12-250
1250
PLAN OF PAD FOOTING (not to scale) DRAWING NO. AAiPF'/2
88
Pengukuran Kuantiti Bangunan
column
column
25mm lean concrete column stump column stump
GROUND BEAM (not to scale)
DRAWING NO. AA/PF/3
D. AAJPF/2
Kerja-kerja Di Bawah Aras Lantai Terbawah
40
>l
4Y12 28R8-250
I
T
I
€
l<
\t
I
soo
>l
150
SECTION OF GROUND BEAM
(not to scale)
*r*Eilt,,
l+l 300
SECTION OF COLUMN STUMP
(not to scale)
DRAWING NO. AA/PF/4
90
Pen'gukuran Kuantiti Bangunan
WORK BELOW LOWEST FLOOR FINISH Takine-off list
AA/PF/4
- m2 2. Deposition of top soil - m3 3. Excvt. to red. lev. - m3 4. Rem. excvtd. mat. - m3 5. Excvt. pit for pad fdn. - m3 6. Fillg. to excvn. - m3 7. Excvn. in rock - m3 8. Excvt. tr. for grd. bm. - m3 9. Rem. excvtd. mat. - m3 10. Excvn. inrock - m3 I l Disp. of surface water - Item 12. Conc. blindg. to Pad fdn. - m3 13. Rem.excvtd. mat. - m3 14. Ddt. fillg. to excvn. - m3 15. Conc. in pad fdn. - m3 16. Rem. excvtd.mat. - m3 17. Ddt. fillg. to excvn. - m3 18. Conc. in sfump - m3 19. Rem. excvtd.mat. - m3 20. Ddt. fillg. to excvn. - m3 21. Fwk. to sides of stumP - m2 22. Reinfl. bars in stump - m 23. Links in stumps - m
l. Excvt. top soil...