Matrix Design

I originally did a post on doing laundry for part one of the assignment. Here is what I had. With the notes I received from the professor.
Caution should be used in selecting this process for improvement. It must be a process that can be used to complete assignments in Weeks 4 & 5. It also must allow for daily data collection.
Improve analysis of selected process and metrics for ability to meet Weeks 4 & 5 requirements

| Load Number | Any Laundry Today? | Wash Time(hrs. ?) | Machine or Hang Dry | Is Dryer Available | Machine Dry Time | Storage Time |
Date | | | | | | | |
9/1/2009 | 0.0 | No | | | | | |
9/2/2009 | 1.0 | Yes | 0.6 | Machine | Yes | 1.1 | 0.0 |
9/3/2009 | 0.0 | Yes | 0.6 | Hang | Yes | 0.0 | 0.0 |
9/4/2009 | 0.0 | No | | | | | |
9/5/2009 | 1.0 | Yes | 0.6 | Machine | Yes | 1.1 | 0.0 |
| 2.0 | | 0.6 | Machine | No | 1.1 | 0.5 |
| 3.0 | | 0.6 | Machine | No | 1.1 | 0.5 |
| 4.0 | | 0.6 | Hang | | | |
| 5.0 | | 0.6 | Machine | Yes | 1.1 | 0.0 |
This did not work for the project. Here is my new idea. I am not sure I am on the right path here. If I could get an example to help guide me I would be better able to learn this process.
Here is the new process submitted for consideration.
My wife and I go to lunch every day to be able to spend some time together. We both work at Kennedy Space Center for different contractors. With school, work, child transport, flight instructing and everything else in our lives, this is some of the only time we get to spend with each other. The limits of our lunch time are 60 minutes. So the upper limit could be 62 minutesĀ and the lower limit 57 minutes.

Is this something that you feel will work for our project?

I really want to get started on this and hopefully achieve a satisfactory outcome.

I have attached a new flow chart and data collection table for your review.
I now need to focus on parts two and three of the assignment.

Date | Departure...