PIG PENS PROJECT 2011
Received 169,000 from D.X.B. on 8/7/2011
a) Paid house rent for the month of July 14,000/-
b) Authorized Mato to take @ 10,000/-
c) Authorized Cathy to take @ 10,000/-
d) To cater for hospital bill @5,000/-
e) Bought used gate for modification later @ 20,000/- at New Kitusuru
f) Bought used gate for @ 4,000
g) Bought gate for pigs entrance @ 3,500/-
h) Transport cost incurred for both gates from Ruai to Nakuru @ 5,810
i) Bought a big water barrel for water at construction site @1,650/-
j) Made 3,967 pieces home made blocks size 18x8 for the perimeter wall for all six plots @5/- =19,835
k) Bought 4,000ltrs of water @ 2,000/-
l) Bought 6,200lts of water @ 2,800/-
m) Bought 7,200lts of water @ 3,000/-
Sub total cost =101,595/-
Withdraw 100,000 on 06/08/2011
Received 225,329 on 11/9/2011
Authorized to deposit money to Co-op bank Ukulima branch =80,000/-
COST OF MATERIALS USED FOR THE PERIMETER WALL
a) Bought 25 bags of cement @ 720 =18,000/-
b) Bought sand at Mwariki pipeline 8tonnes @ 3000/- and cost of delivery @ 5,500=8,500/-
c) Labour cost used for perimeter wall so far @46,500
d) Polythene bags used as DPC for perimeter wall @1,000/-
Sub total cost =154,000/-
PIG PENS CONSTRUCTION
1. Excavation
Preparing field, uprooting trees and leveling the ground) for two days @ 500/-
2 kgs of nails 3”inches @ 360/-
1 kgs of 2 ½ “inches @130/-
Sisal rope @120/-
Offcuts 17pcs @55/- 900/-
Sub total cost=2,010
2. Foundation digging
Day one
Fundi Mwaura @ 800/-
4 casual labourers @1,800/-
Day two
2 casual labourers @ 600/-
Sub total=3,200
3. Foundation settings
Day one
Fundi Njuguna (snr) @ 800/-
2 casual labourers @ 250 =500/-
4 bags of cement @720=2880
Day two
Fundi Njuguna (snr) @800/-
2 casual labourers @250 =500/-
Fundi Karis @500
1 casual @ 100/-
Day three
Fundi Karis @ 500/-
Fundi Muya @500/-...