The ball mill Loading and running time of the commissioning Idle running 3-7 hours or Install 5 / 6 of the ball mill grinding operation of 10-12 hours. and Load all the ball mill grinding operation of 15 hours. Must be emphasized that the above-mentioned load growth rate, not to exceed the actual progress of gear mesh adjust the extension of its load growth rate, not to exceed gear tooth contact rate the accuracy of the principle that end, operation of the ball mill each stage, it is necessary to seriously examine the meshing of gear, when found to be abnormal should unloading and extend the ball mill operating time, the contacts did not meet the ball mill design requirements accuracy shall not operate at full capacity.The working principle of ball mill from the feeding part, discharging Department, Rotary Department, Transmission Division (reducer, small transmission gear, motors, electrical control) and other major components. Ceramic industry has a horizontal tube, tube was plate (there are many small hole drilling of circular plate - sieve) into 3 or 4 grinding chamber, each of the grinding chamber for grinding with a certain body shape and size , cylinder rotates, the material and grinding bodies such as the friction and cylinder under the action of centrifugal force to upgrade to a certain height, and then under the action of gravity along the parabolic trajectory similar to the impact and grinding down to the bottom of the tube to another part of the material, and produce a certain axial movement which makes the material grinding and mixing. Ceramic ball mill are low-speed heavy equipment, loading capacity, is also a great starting torque, the Ceramic Ball usually add the impact of start or soft start motor starter to start, the impact of large power grid, and start running after the completion of the required The turn away from reduced, so saving energy has a lot of space.At the present, Hongxing mining machinery has set up three state level machinery...